BREAKDOWN OF UNIT PRICE
Item: (B03B) Sink-SS Double Bowl
Basis:1 no.
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
White Cement-Elephant
1.500
kg
40.00
60.00
Sub-Total(A1)
60.00
60.00
B1.Plumbing/Sanitr Pipe
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sink-Double Bowl
1.000
no.
7000.00
7000.00
Sub-Total(B1)
7000.00
7000.00
B2.Sanitary fittings
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
32mm PVC Waste Pipe
2.000
no.
360.00
720.00
Grating with Brass Copuli
2.000
no.
300.00
600.00
CP Chain with rubber plug
2.000
no.
80.00
160.00
Sub-Total(B2)
1480.00
1480.00
L4.Labour-Sanitary
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sink-double bowl fitting
1.000
no.
400.00
400.00
Sub-Total(L4)
400.00
400.00
Total(1)
8940.00
Add over head on Total(1)
5.0 %
447.00
Total(2)
9387.00
Add Profit on Total(2)
10.0 %
938.70
Total(3)
10325.70
Add VAT on Unit Price
5.5 %
634.54
Add Income Tax on Unit Price
5.0 %
576.85
Unit Price
11537.09
Say
11537
per NO