BREAKDOWN OF UNIT PRICE
Item: (A32A4) Supl Buildup Col,Rafter,Bm-G40,Pr
Basis:1000 kg.
A3.Material-Paint
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Thinner-T6/T7
4.000
Ltr
120.00
480.00
Red Oxide Primer
12.000
Ltr
180.00
2160.00
Sub-Total(A3)
2640.00
2640.00
C1.Steel Structures
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
MS Plate-Grade-345
1020.000
kg
124.00
126480.00
Sub-Total(C1)
126480.00
126480.00
Total(1)
129120.00
Add over head on Total(1)
5.0 %
6456.00
Total(2)
135576.00
Add Profit on Total(2)
10.0 %
13557.60
Total(3)
149133.60
Add VAT on Unit Price
5.5 %
9164.63
Add Income Tax on Unit Price
5.0 %
8331.49
Unit Price
166629.72
Say
166630
per ton