Return Main Menu
BREAKDOWN OF UNIT PRICE
Item: (A17) Pile Extension-Extra
Basis:1 no.
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
GI Wire
1.000
kg
260.00
260.00
Re-bar G60
31.752
kg
101.50
3222.83
Sub-Total(A1)
3482.83
3482.83
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Earth Work in Excavation
61.000
cft
12.00
732.00
Filling
61.000
cft
6.00
366.00
Pile Form Work
11.302
sft
8.00
90.42
Re-bar work-Substructure
31.752
kg
8.00
254.02
Pile head cutting rod
1.000
no.
200.00
200.00
Dismantling RCC Pile head
5.200
cft
70.00
364.00
Re-bar welding
1.000
LS
200.00
200.00
Sub-Total(L1)
2206.43
2206.43
Total(1)
5689.26
Add over head on Total(1)
5.0 %
284.46
Total(2)
5973.72
Add Profit on Total(2)
10.0 %
597.37
Total(3)
6571.10
Add VAT on Unit Price
5.5 %
403.81
Add Income Tax on Unit Price
5.0 %
367.10
Unit Price
7342.01
Say
7342
per NO.