BREAKDOWN OF UNIT PRICE
Item: (A15A9) Pile Boring-400mm dia-Winch-Derrk
Basis:3 rft
E1.Equipment-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Lubricant
0.030
Ltr
220.00
6.60
Diesel
3.000
Ltr
70.00
210.00
H.C. Tripod, Winch M/c
0.050
day
3000.00
150.00
H.C. of Derrik
0.050
day
400.00
20.00
H.C. of Water Pump
0.050
day
500.00
25.00
H.C. of Triemie Pipe
0.050
day
500.00
25.00
H.C.of Bailer
0.050
day
300.00
15.00
H.C. of Cutter
0.050
day
200.00
10.00
H.C.Water Sealing Device
0.050
day
200.00
10.00
H.C. of Welding M/c
0.050
day
500.00
25.00
H.C.Air Compressor-250cfm
0.008
day
3000.00
24.00
Sub-Total(E1)
520.60
520.76
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Shutter replace
0.150
no
500.00
75.00
Orinary Labour-1
0.300
no.
600.00
180.00
Foreman
0.050
no.
1000.00
50.00
Sub-Total(L1)
305.00
305.09
M1.Misc.-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Bentonite
7.000
kg
30.00
210.00
Bentonit Slury Tank-400mm
1.000
sum
107.80
107.80
Lab-Pile Boring-400mm dia
1.000
sum
23.70
23.70
Sub-Total(M1)
341.50
341.60
Total(1)
1167.46
Add over head on Total(1)
5.0 %
58.37
Total(2)
1225.83
Add Profit on Total(2)
10.0 %
122.58
Total(3)
1348.41
Add VAT on Unit Price
5.5 %
82.86
Add Income Tax on Unit Price
5.0 %
75.33
Unit Price
1506.61
Say
1507
per RM