BREAKDOWN OF UNIT PRICE
Item: (A09Q8) Fenc-H=2.5m@2.5m c/c,Pipe-Chain
Basis:100 rft
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand - Local
5.850
cft
35.00
204.75
Cement
2.340
bag
535.00
1251.90
Brick-chips-20mm
11.700
cft
175.00
2047.50
Sub-Total(A1)
3504.15
114.97
E1.Equipment-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mixer m/c and vibrator
13.000
cft
4.00
52.00
Sub-Total(E1)
52.00
1.71
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Earth Work in Excavation
29.250
cft
12.00
351.00
Filling
16.250
cft
6.00
97.50
RCC Work-Substructure
13.000
cft
40.00
520.00
Form work-Substructure
52.000
sft
40.00
2080.00
Sub-Total(L1)
3048.50
100.02
M1.Misc.-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Shutter-Rent/ Used
52.000
sft
35.00
1820.00
Point Welding
150.000
poin
2.50
375.00
Electricity Cost
100.000
rft
0.50
50.00
Sub-Total(M1)
2245.00
73.66
Total(1)
290.36
Add over head on Total(1)
5.0 %
14.52
Total(2)
304.87
Add Profit on Total(2)
10.0 %
30.49
Total(3)
335.36
Add VAT on Unit Price
5.5 %
20.61
Add Income Tax on Unit Price
5.0 %
18.74
Unit Price
374.71
Say
375
per M