BREAKDOWN OF UNIT PRICE
Item: (A08DQ) RCC(1:2:4) Form,Brickchp-Dropwall
Basis:100 sft
A1.Materials-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Sand - Local
11.250
cft
35.00
393.75
Cement
4.500
bag
535.00
2407.50
Brick-chips-20mm
22.500
cft
175.00
3937.50
Sub-Total(A1)
6738.75
725.36
E1.Equipment-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Mixer m/c and vibrator
25.000
cft
4.00
100.00
Sub-Total(E1)
100.00
10.76
L1.Labour-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
RCC Work-Substructure
25.000
cft
40.00
1000.00
Form work-Substructure
200.000
sft
40.00
8000.00
Sub-Total(L1)
9000.00
968.76
M1.Misc.-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Shutter-Rent/ Used
200.000
sft
35.00
7000.00
Sub-Total(M1)
7000.00
753.48
Total(1)
2458.36
Add over head on Total(1)
5.0 %
122.92
Total(2)
2581.28
Add Profit on Total(2)
10.0 %
258.13
Total(3)
2839.41
Add VAT on Unit Price
5.5 %
174.49
Add Income Tax on Unit Price
5.0 %
158.63
Unit Price
3172.52
Say
3173
per SQM