BREAKDOWN OF UNIT PRICE
Item: (C01Q7) Concrete-4500psi-16th Floor
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-4500ps
100.000
cft
280.00
28000.00
Sub-Total(A1)
28000.00
9888.20
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at 16th Floor
84.118
sft
360.00
30282.48
Sub-Total(B4)
30282.48
10694.26
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
1600.000
cft
0.75
1200.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
2300.00
812.25
Total(1)
21394.70
Add over head on Total(1)
5.0 %
1069.74
Total(2)
22464.44
Add Profit on Total(2)
10.0 %
2246.44
Total(3)
24710.88
Add VAT on Unit Price
5.5 %
1518.55
Add Income Tax on Unit Price
5.0 %
1380.50
Unit Price
27609.92
Say
27610
per cum