BREAKDOWN OF UNIT PRICE
Item: (C01A2) Concrte-3500 psi in GF Roof
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-3500ps
100.000
cft
250.00
25000.00
Sub-Total(A1)
25000.00
8828.75
B4.Labour SuperStructu
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure at GF
62.355
sft
109.00
6796.70
Sub-Total(B4)
6796.70
2400.25
E1.Equipment Cost
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Concrete Pump upto Gr.flr
100.000
cft
8.00
800.00
Concrete Pump above G.F.
100.000
cft
0.75
75.00
Vibrator and Mixer M/c
100.000
cft
3.00
300.00
Sub-Total(E1)
1175.00
414.95
Total(1)
11643.95
Add over head on Total(1)
5.0 %
582.20
Total(2)
12226.15
Add Profit on Total(2)
10.0 %
1222.62
Total(3)
13448.77
Add VAT on Unit Price
5.5 %
826.46
Add Income Tax on Unit Price
5.0 %
751.33
Unit Price
15026.56
Say
15027
per cum