BREAKDOWN OF UNIT PRICE
Item: (B06F) Concrete-4500psi in Basement-1
Basis:100 cft
A1.Material Cost-Civil
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Ready Mix Concrete-4500ps
100.000
cft
280.00
28000.00
Pumping Charge
100.000
cft
4.00
400.00
Sub-Total(A1)
28400.00
10029.46
B3.Labour-Substructur-2
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Structure-Ground-Level
73.103
sft
185.00
13524.06
Sub-Total(B3)
13524.06
4776.02
Total(1)
14805.48
Add over head on Total(1)
5.0 %
740.27
Total(2)
15545.75
Add Profit on Total(2)
10.0 %
1554.58
Total(3)
17100.33
Add VAT on Unit Price
5.5 %
1050.86
Add Income Tax on Unit Price
5.0 %
955.33
Unit Price
19106.51
Say
19107
per M3