BREAKDOWN OF UNIT PRICE
Item: (B03E) Excavation above GF
Basis:100 cft
B3.Labour-Substructur-2
Item
Quantity
Unit
Rate(Tk.)
Cost(Tk.)
Rate(Tk.)
Excavation above 0.0 ft
100.000
cft
3.50
350.00
Sub-Total(B3)
350.00
123.60
Total(1)
123.60
Add over head on Total(1)
5.0 %
6.18
Total(2)
129.78
Add Profit on Total(2)
10.0 %
12.98
Total(3)
142.76
Add VAT on Unit Price
5.5 %
8.77
Add Income Tax on Unit Price
5.0 %
7.98
Unit Price
159.51
Say
160
per M3